top of page
unnamed (1).jpeg

BLDG (HANGER) 212

NAS Oceana - Bldg (Hanger) 212 Level III Preservation for NAVAIR. This project was to convert Bldg 212 hanger into a humidity controlled space for storing jet parts. The Scope of work included the resealing of hanger doors, replacement of pedestrian doors, enclosing large louver openings with concrete block and matched the existing EIFS. G5 also designed and placed a 6,000 sq ft concrete pad inside hanger as well as two exterior concrete ramps.

bottom of page